Company: Columbus Stainless SteelNumber of items: 1. 2006Ali, M.M. and Kaelo, P. and Ackerman, J. (2006) Scheduling of material through a steel plant. Mathematics in Industry Study Groups in South Africa > MISGSA 2006: University of the Witwatersrand (23rd - 27th January 2006). This list was generated on Sun Oct 12 13:10:41 BST 2008. |