The MIIS Eprints Archive

Scheduling of material through a steel plant

Ali, M.M. and Kaelo, P. and Ackerman, J. (2004) Scheduling of material through a steel plant. [Study Group Report]

[img]
Preview
PDF
78Kb

Abstract

This paper addresses the optimal scheduling of material in a steel plant. The genetic algorithm is adapted to handle various constraints in the processing mills.

Item Type:Study Group Report
Problem Sectors:Energy and utilities
Retail
None/Other
Study Groups:Mathematics in Industry Study Groups in South Africa > MISGSA 2004: University of the Witwatersrand (19th - 23rd January 2004)
Company Name:Columbus Stainless Steel
ID Code:61
Deposited By:Gordon White
Deposited On:04 Apr 2006
Last Modified:10 Mar 2010 18:19

Repository Staff Only: item control page