Study Groups

Scheduling of material through a steel plant

Ali, M.M. and Kaelo, P. and Ackerman, J. (2006) Scheduling of material through a steel plant. Mathematics in Industry Study Groups in South Africa > MISGSA 2006: University of the Witwatersrand (23rd - 27th January 2006).

Full text available as:

PDF - Requires Adobe Acrobat Reader or other PDF viewer.

Abstract/Summary

This paper addresses the optimal scheduling of material in a steel plant. The genetic algorithm is adapted to handle various constraints in the processing mills.

Item Type:Study Group Report
Study Group:Mathematics in Industry Study Groups in South Africa > MISGSA 2006: University of the Witwatersrand (23rd - 27th January 2006)
Company Name:Columbus Stainless Steel
Industrial Sector:Energy and utilities
Retail
None/Other
ID Code:61
Deposited By:Gordon White
Deposited On:04 April 2006

Archive Staff Only: edit this record